Progress in Pictures
APRIL 2011
Clockwise from top left:
The first classroom block as it looked before work began; building materials are unloaded at the school.
Building work began on the exterior walls to replace the ring beam above the windows and re-build the end apexes.

MAY 2011
Clockwise from top left:
The community was responsible for bringing bricks, water and other raw materials, which enabled the builders to make speedy progress constructing the roof and a veranda, replacing the floors and window panes, and plastering and painting inside and out.

JUNE 2011
Clockwise from top left:
Once the painting of the walls and shuttering was done, the first block was complete!