Progress in Pictures

APRIL 2011

 

Clockwise from top left:

The first classroom block as it looked before work began; building materials are unloaded at the school.

Building work began on the exterior walls to replace the ring beam above the windows and re-build the end apexes.

 

Progress in pics 1

 

MAY 2011

 

Clockwise from top left:

The community was responsible for bringing bricks, water and other raw materials, which enabled the builders to make speedy progress constructing the roof and a veranda, replacing the floors and window panes, and plastering and painting inside and out.

 

Progress in pics 2

 

JUNE 2011

 

Clockwise from top left:

Once the painting of the walls and shuttering was done, the first block was complete!

 

Final stages 1

 

Final stages 2